Inspiration feed - find inspirational articles and much more
- Case
12. October 2026 | Linka Energy A/S
Ausumgaard Biogas
Linka® Heavy-Duty Walking Floor for automatic biomass handling and continuous feedstock supply to biogas production.
At Ausumgaard Biogas near Hjerm, Denmark, Linka Energy has supplied a robust Wal
- Case
28. September 2026 | Linka Energy A/S
BioCirc Group – Vinkel Bioenergi
2 × 5 MW Linka® multifuel biomass plants for straw and wood chips, supplying process heat to the biogas plant.
Vinkel Bioenergi is one of Denmark's largest biogas plants and is designed to handle a
- Case
28. September 2026 | Linka Energy A/S
NATURE ENERGY KVÆRS A/S
Linka® straw handling system for biogas production with a capacity of up to 4 tonnes of straw per hour.
Nature Energy Kværs produces biogas from agricultural biomass. As part of the plant, Linka En
28. September 2026 | Linka Energy A/S
Linka® Heavy-Duty Walking Floor – Automatic Handling of Solid Biomass
Efficient and reliable handling of solid biomass is essential for ensuring a continuous feedstock supply to biogas plants.
The Linka® Heavy-Duty Walking Floor is designed for the automatic handling
- Case
21. September 2026 | VOGELSANG
Case: Biogas plant processes up to 50 m³ of fruit and vegetables each week
LEKABO receives between 20 and 50 m³ of fruit and vegetables for biogas production every week. Varying materials and large deliveries at short notice required a robust grinder with sufficient capacity
17. September 2026 | VOGELSANG
Two XSplit slurry separators increase storage capacity on a 680-cow dairy farm
Sand in the slurry caused Chalder Farm problems with wear, cleaning and storage capacity. With two XSplit slurry separators, the farm now has a more consistent liquid fraction that is easier and faste
- Case
17. September 2026 | VOGELSANG
Case: 140 kg weight reduction without compromising pump performance
At Hessler Agrar-Energie, switching to a compact LoadMaster slurry pump made the company’s slurry tankers almost 140 kg lighter. The lower unladen weight provides the potential for a higher payload –
- Case
15. September 2026 | Lundsby Renewable Solutions
Langaa Bioenergi
Langaa Bioenergy – Upgrade and Modernization of an Existing Biogas Plant.
Lundsby has carried out an extensive upgrade of the Langå Bioenergi biogas plant in close collaboration with the client. Th
Responsibility for content on this site
Information, images, product descriptions, videos, certifications, sustainability claims, and other content on company profiles are uploaded and maintained by the individual exhibitors.
Exhibitors are solely responsible for ensuring that their content is accurate, properly documented, and legally compliant, including compliance with applicable regulations concerning marketing, sustainability claims, and intellectual property rights.
MCH A/S solely provides the platform and does not, as a general rule, verify the content.