- Case
21. September 2026 | VOGELSANG
Case: Biogas plant processes up to 50 m³ of fruit and vegetables each week
LEKABO receives between 20 and 50 m³ of fruit and vegetables for biogas production every week. Varying materials and large deliveries at short notice required a robust grinder with sufficient capacity
- Case
17. September 2026 | VOGELSANG
Case: Meyer Biogas saves around 200 kWh per day with the RotaCut macerator
Long-fibred feedstocks, floating layers and high energy consumption limited operations at Meyer Biogas. After converting to a liquid feeding system with a RotaCut® RCX macerator, the biomass became mo
- Case
16. September 2026 | VOGELSANG
Case: More than two years of operation without cleaning the digester
At one of Ronconi’s biogas plants, long fibres caused frequent operational problems and required the digester to be cleaned almost every month. At the second plant, the PreMix® solid matter feeder cre
- Case
16. September 2026 | VOGELSANG
Case: More than 10 years of continuous operation without blockages
Coarse materials and fibres in the organic biomass caused weekly blockages in Agrinord’s recirculation system. After a RotaCut® RC 5000pro macerator was installed, the blockages were eliminated. The p
Newest products in Energy
Articles and inspiration in Energy
17. September 2026 | VOGELSANG
Two XSplit slurry separators increase storage capacity on a 680-cow dairy farm
Sand in the slurry caused Chalder Farm problems with wear, cleaning and storage capacity. With two XSplit slurry separators, the farm now has a more consistent liquid fraction that is easier and faste
28. October 2025 | Agromek
North-Tec Maschinenbau launches Ding.X Traceability – complete digital solution for biogas plants
Smart software for full traceability and RED II/III compliance awarded one star at Agromek Stars 2025.
North-Tec Maschinenbau GmbH presents Ding.X Traceability – an advanced software solution tha